EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sport
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (60)
Research
Workshop
- (1)
-
Kit Delivered,...
Empennage
- (1)
-
Building of the...
Fuselage
- (22)
-
Baggage compartment...
-
Riveted bottom...
-
Cheek and joggle...
-
Fuselage construction
-
Removed Elevators...
-
Installed elevators...
-
Assembled and...
-
Installed rudders...
-
Bottom skin fitting,...
-
Upper panel, seat...
-
Fit front cheek...
-
Fit vertical...
-
Fit and up drilled...
-
Fit horizontal tail...
-
Joining tail cone to...
-
Started fitting...
-
Tailcone final assembly
-
Tail spring mount...
-
Worked on assembly...
-
Assembled side...
-
Assembled upper...
-
Fitted and assembled...
Firewall
Tail Feathers
Wings
- (22)
-
Riveted fuel tanks on
-
Fitting wings and...
-
Aileron and flap...
-
Installed optional...
-
Installed Wings
-
Installed aileron...
-
Riveted more ribs....
-
Fitted longerons...
-
Fitted fuel tanks to...
-
Left & Right...
-
Finished wings, on...
-
Squared and leveled...
-
Installed pitot tube...
-
Debur, dimple and...
-
Debur, dimple repeat.
-
Removed skins from...
-
Fitted all skins and...
-
Mounted right wing...
-
Shortened rear spars...
-
Spar construction
-
Wing construction
-
Set up wing jigs and...
Controls
- (11)
-
Flap lever and linkage
-
Aileron bell crank...
-
Finished installing...
-
Riveted tail section...
-
Riveted tail section...
-
Elevator balance,...
-
Finished elevator...
-
Removed vertical...
-
Installed elevator...
-
Aileron Construction
-
Flap construction
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
-
O-320 A1A Assembly
Propeller
Fuel System
- (2)
-
Dissassembled Carb
-
Built fuel tank jig.
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Barry Cole
-
Project:
Sport Performance - Panther
-
VIEW REPORTS
Total Hours:
562
Total Flight Time:
4.6
Start/Last Date:
Jan 01, 2018 - No Finish Date
Engine:
Lycoming O-320
Friendly URL:
https://eaabuilderslog.org?s=Sport
Home or Last Project Picture
Jan 26, 2018
Building of the empennage.
- (62 hours)
Category: Empennage
Photos of the horizontal stabilizer, vertical stabilizer, elevator and rudder.
15.jpg
23.jpg
25.jpg
26.jpg
30.jpg
Photo Feb 18, 18 09 09.jpg
Photo Feb 19, 12 05 56.jpg
Photo Feb 19, 12 28 06.jpg
Photo Feb 19, 15 54 57.jpg
Photo Feb 20, 13 51 41.jpg
Photo Feb 25, 13 05 08.jpg
Photo Feb 27, 20 09 00.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.